4.8M earthquake at 4 km NNE of Ciputat, Indonesia
Powerplants
Hydro
Oil
Solar
Gas
Wind
Geothermal
Earthquake Details
Time (UTC) | Date | Location | Magnitude |
---|---|---|---|
20:32:18 | 2023-01-14 | 4 km NNE of Ciputat, Indonesia | 4.8 |
🏭 Nearby Power Generation Facilities (within 50 kilometers)
Name | Capacity (MW) | Owner | Primary Fuel Type |
---|---|---|---|
Cikarang Babelan power station | 280.0 | PT Cikarang Listrindo | Coal |
PLTG Cikarang Listrindo | 150.0 | PT. Cikarang Listrindo | Gas |
PLTG Muara Tawar B-3 | 420.0 | PT. PJB | Gas |
PLTG Muara Tawar Block 4 | 420.0 | PT. PJB | Gas |
PLTG Priok | 52.0 | PT. Indonesia Power | Gas |
PLTGU Bekasi Power | 130.0 | PT. Bekasi Power/PT. Kawasan Industri Jababeka Tbk | Gas |
PLTGU Muara Karang Block I | 509.0 | PLN â Java Bali Generation Unit / PT. PJB | Gas |
PLTGU Muara Karang repowering | 753.0 | PLN â Java Bali Generation Unit / PT. PJB | Gas |
PLTGU Muara Karang repowering Blok 2 | 210.0 | PLN â Java Bali Generation Unit / PT. PJB | Gas |
PLTGU Muara Tawar Block 1 &2 | 920.0 | PT. PJB | Gas |
PLTGU Muara Tawar Block 5 | 384.0 | PT. PJB | Gas |
PLTGU Priok Block 1 2 | 1180.0 | PT. Indonesia Power | Gas |
PLTU Banten 1 - Suralaya unit 8 | 625.0 | PLN -.PT Indonesia Power - 2010 | Coal |
PLTU Banten 3 - Teluk Naga/Lontar | 945.0 | PLN + Dongfang Electrik Corp PT Dalle Energy | Coal |
PLTU Muara Karang | 400.0 | PLN - Java Bali Generation Unit / PT. PJB | Coal |
PLTU Priok 3 & 4 | 100.0 | PT. Indonesia Power | Coal |